Structural steel

Structural steel welding automation for heavy fabrication

Structural work demands consistent, code-quality welds on heavy material: beams, columns, base plates, and connections. The Cobot Welder handles MIG on thick plate and structural sections, programs from a smartphone, and frees your certified welders for the complex joints that need their expertise.

Robotic welding on stainless structural sectionsSTRUCTURAL STEEL — HEAVY FAB

800+

Shops running Beacon

400%

Output increase at Advanta

Throughput increase

Same day

Unboxing to welding parts

Sound familiar?

The problems slowing your floor down

Certified structural welders are nearly impossible to find

AWS D1.1 work requires certified welders, the most in-demand trade in fabrication. Every open position costs you capacity, and you're turning down steel contracts for lack of hands.

Heavy plate means slow, fatiguing work

Long seams on thick plate, overhead positions, hours of arc time per assembly. Fatigue breeds inconsistency, and on structural work that means failed inspections and rejected loads.

Traditional robotic welding doesn't fit your workflow

Conventional cells are built for one part, thousands of repetitions. Your work runs in batches of 20–200 with varying joints and specs. Programming a traditional robot takes longer than welding by hand.

How it works

How cobot automation fits your workflow

01

Set up your weld from your phone

Open Beacon, touch the weld joints on your assembly, and set wire speed, voltage, travel speed, and weave. Carbon steel from 10-gauge through heavy structural sections. If your welder can read a WPS, they can run this.

02

Weld & monitor in real time

The cobot runs repetitive fillets, stiffener plates, and gussets while your certified welders take the full-penetration grooves. Beacon tracks every parameter so quality is verified before the part leaves the station.

03

Switch jobs in minutes

Save every weld program and recall it instantly: beam-to-column connections, base plates, bracing. No reprogramming, no integrator call, no downtime.

Mark Moye at Advanta SoutheastADVANTA — SAME-DAY PRODUCTION

In the field

“Our first Cobot Welder arrived within two weeks. By the end of that same day, we were welding parts. That never happens with robotics.”
Mark Moye · Plant Manager — Advanta Southeast
Read customer stories →

Start

Ready to automate your structural steel shop?

See how cobots increase throughput on beams, columns, and plate work without traditional robotic complexity or more certified-welder overhead.